BluEntCAD uses Vectorworks software to develop architectural drafting, construction documents and 3D model for architects, designers and residential homebuilders.
Today an architecture, engineering, & construction industry adopts BIM processes for design, construction, and post-construction operations & management of the facility, the function of drawing and drafting complex MEP systems is also changing.
To those great minds involved in delivery phase of projects, 5D BIM is a blessing in disguise. Cost manager offers utmost value through their Cost planning, at the conceptual front end stages of a project by providing Cost advice and estimates on various Design proposals and then refining those estimates as the design evolves.
Up until two weeks back, only very digitally savvy people were heard using the term Augmented Reality - AR. Pokemon Go has turned the tables drastically bringing in immense awareness about AR. the truth is that many contractors and architects are experimenting with AR as a visualization tool, which means the technology is already being used in the built environment as part of the architectural and structural design process.